Concrete Block Fill Calculator

    How are you figuring it?

    Two ways in — start from a block count you already have, or from the wall's size and we'll count the blocks the same way the block calculator does.

    Your blocks & the fill

    Grout only goes where you fill — the pattern is what decides the yardage.

    The blocks in the wall you're filling — not the order count with extras, just the wall itself.

    Block size — blocks filled per cubic yard shown (all cells)
    Fill pattern — which cores get grout?

    Your plans or local code set the rebar spacing — the pattern follows it. Bond beams and lintels aren't in these numbers.

    Waste allowance — extra for spills, pump priming & cleanouts

    Your grout order

    Order this much grout

    – yd³

    How this is figured: yardage comes from the industry-standard estimating table — blocks filled per cubic yard with every cell grouted — scaled by your fill pattern. Core sizes vary some by manufacturer, so treat it as a planning number and confirm with your supplier.

    Exact volume
    –
    Cubic feet
    –
    If mixing — 80-lb bags
    –
    Blocks being filled
    –

      💡 Pro field tips

        🧰 Tools you'll need

        Tap to check off as you load up.

        Est. material cost (optional — fill one or both)

        File this estimate under a job name or PO to track what to order. Leave blank to file under "General".

        Assumptions & limits: Yardage comes from the industry-standard estimating table for block fill — blocks filled per cubic yard with every cell grouted (6-in: 120, 8-in: 100, 10-in: 80, 12-in: 65) — scaled by your fill pattern. These are planning estimates: actual core sizes vary by manufacturer, so a real wall can run a little over or under. Only the cores take grout — the face shells and webs are already solid. Horizontal bond beams, lintels and pilasters are not included; figure those with the concrete calculator and add them on. Grout is not mortar — mortar beds the joints, grout fills the cores. Structural fill patterns and rebar spacing are set by your plans and local code, not by this form.

        Estimates for planning only — confirm final quantities with your supplier and follow local building code.

        How the math works

        The concrete block calculator tells you how many blocks the wall takes. This is the second half of the same job: once the wall is standing, how much grout goes inside it. Block fill runs off one standard table and one question — which cores are you actually filling?

        The estimating table: blocks per cubic yard

        Estimators figure grout from a long-standing rule of thumb — how many blocks one cubic yard of grout fills when every cell is grouted solid:

        • 6-inch block — 120 blocks per yd³
        • 8-inch block — 100 blocks per yd³
        • 10-inch block — 80 blocks per yd³
        • 12-inch block — 65 blocks per yd³

        Yards of solid fill = Blocks ÷ Blocks per yard for your size. It's a planning table, not a lab measurement — actual core sizes vary a bit by manufacturer, which is exactly why the waste allowance rides on top.

        The fill pattern scales it

        Most walls don't get filled solid. Only the cells with vertical rebar take grout, and the rebar spacing decides what fraction of the table you need:

        • All cells — × 1.00 (fully grouted)
        • Cores at 16″ o.c. — × 0.50
        • Cores at 24″ o.c. — × 0.33 (⅓)
        • Cores at 32″ o.c. — × 0.25
        • Cores at 48″ o.c. — × 0.17 (⅙)

        Exact grout = Solid-fill yards × Fill factor. Filling every cell instead of just the rebar cores at 32″ quadruples the order — the single most common block-fill mistake is ordering solid-fill yardage for a wall that only needed its rebar cells.

        Bags: 45 to a yard

        Mixing instead of ordering a truck? An 80-lb bag of grout or concrete mix yields about 0.6 ft³, so bags = Cubic feet ÷ 0.6 — the same as 45 bags per cubic yard. Past a yard or so, a pump or a ready-mix truck is almost always cheaper than the bags and the mixing.

        Wall mode uses the block calculator's count

        Starting from wall size, the block count is figured exactly like the block calculator: a block plus its ⅜″ mortar joint covers 0.889 ft², so blocks = Net wall area × 1.125, rounded up, with openings subtracted first.

        Worked example: 20 × 8 ft wall, 8-inch block, all cells, 10% waste

        • Blocks: 160 ft² × 1.125 = 180 blocks
        • Solid fill: 180 ÷ 100 per yd³ = 1.80 yd³ (48.6 ft³)
        • All cells filled → no reduction: 1.80 yd³ exact
        • With 10% waste: 1.80 × 1.10 = 1.98 yd³ (53.46 ft³)
        • Bags instead: 53.46 ÷ 0.6 = 89.1 → 90 bags of 80-lb mix

        Two yards on the truck, or ninety bags and a long morning — same wall. Run it both ways before you decide.

        Worked example

        A 24 × 8 ft foundation wall in 8-inch block, with vertical rebar — and grout — only in cores at 32″ on center:

        • Blocks: 192 ft² × 1.125 = 216 blocks
        • Solid-fill table: 216 ÷ 100 = 2.16 yd³
        • Cores at 32″ (× 0.25): 0.54 yd³ exact (14.58 ft³)
        • With 10% waste: 0.59 yd³ (16.04 ft³) — or 27 bags of 80-lb mix

        Order this wall solid-filled by mistake and you'd have bought four times the grout — about 2.4 yards of it with nowhere to go.

        On a real job

        • Leave cleanouts at the bottom of filled cells. On taller pours the bottom block of each grouted core is left out (or a cleanout block used) so debris can be raked out and the foreman can see the grout reach the bottom — then it's closed before the fill.
        • Consolidate every lift. Rod the grout or run a small vibrator as it goes in. Grout bridges across cell webs and leaves hidden voids if it's just poured from the top and trusted.
        • Pour in lifts, and brace the wall. Wet grout is heavy and pushes hard on green masonry. Follow your code's lift heights, brace long or tall walls, and don't fill a wall the same morning it was laid.
        • Prime the pump with the order in mind. A pump and hose hold grout you'll never get back — that's part of what the waste allowance is for. On a small job, bags and a wheelbarrow can beat a pump minimum.
        • Keep a few bags on site even with a truck coming. Cleanouts blow out and trucks run short. A couple of bags of grout mix turn a pour-day emergency into a ten-minute fix.

        Most Asked Questions

        How much grout does it take to fill 100 blocks?

        Exactly 1 cubic yard for 8-inch block with every cell filled. The estimating table figures 100 blocks per yd³ at that size; 6-inch block runs 120 per yard (100 blocks ≈ 0.83 yd³) and 12-inch runs 65 (≈ 1.54 yd³). Fill only the rebar cores and it drops fast — at 32″ spacing, 100 blocks take just 0.25 yd³.

        How many 80-lb bags make a cubic yard of grout?

        45 bags. One 80-lb bag yields about 0.6 ft³ and a cubic yard is 27 ft³: 27 ÷ 0.6 = 45. This calculator counts bags the same way, after your fill pattern and waste are applied.

        Do all the cells in a block wall need to be filled?

        Usually not — only the cells that hold vertical rebar. Most walls fill cores at the spacing the plans call for — every 16, 24, 32 or 48 inches — plus bond beams. Filling every cell instead of 32″ cores takes four times the grout.

        Is block fill the same thing as mortar?

        No — different materials doing different jobs. Mortar beds the block and holds the wall together at the joints. Block fill is grout poured into the hollow cores after the wall is up, usually around vertical rebar. A wall order usually needs both.

        Does this calculator include bond beams and lintels?

        No — it figures the vertical cores of the wall only. Horizontal bond beams, lintels over openings and pilasters also take grout; figure those runs with the concrete calculator and add them to this number.

        Can I figure the fill from a wall size instead of a block count?

        Yes — enter the wall and it counts the blocks for you. Wall mode uses the same 1.125 blocks per sq ft as the block calculator: a 20 × 8 wall is 180 blocks, which fills solid at 1.8 yd³ — 1.98 yd³ with the 10% chip tapped.

        Next calculation

        One job usually leads to the next number. Common next steps from here:

        Embed this calculator on your site

        Run a DIY, contractor, or supplier site? Put this concrete block fill calculator right on your page, free. Copy the code and paste it where you want it — your visitors get the numbers without leaving your site.

        Free to use. The small “Powered by Kipi Calculator” line at the bottom of the calculator stays on — that’s all we ask.