Drywall Calculator
What are you covering?
Diagram: what the measurements mean
Walls, ceiling, or the whole room — pick one.
Pick what you're covering to continue.
Tell me about the room
Measure wall to wall — not the floor area, the surfaces you're covering.
Floor to ceiling — this is the #1 number people guess wrong.
We subtract ~21 ft² per door and ~15 ft² per window so you don't overbuy.
Pick your sheet size
Bigger sheets = fewer seams = less taping. If they'll fit through the door, go big.
Pick a sheet size to continue.
Waste allowance — extra for miscuts, broken corners & drops
Your drywall count
Buy this many sheets
–
- Net area
- –
- Exact sheets
- –
- Joint compound
- –
- Tape + screws
- –
💡 Pro field tips
🧰 Tools you'll need
Tap to check off as you load up.
Est. project cost (optional)
File this estimate under a job name or PO to track what to order. Leave blank to file under "General".
Copied to clipboard ✓
How the math works
Drywall estimating is area math with an honest attitude about waste: figure out how many square feet of wall and ceiling you're covering, divide by what one sheet covers, and accept that cutting drywall always throws some away. You can't uncut a sheet, and every outlet box, window return, and angled wall eats a little more. Pros budget for it — stopping work to buy one more sheet costs more than the sheet.
Wall and ceiling area
Walls: measure the perimeter of the room and multiply by ceiling height. A 12 × 14 room has a 52-foot perimeter; at 8-foot ceilings that's 416 square feet of wall. Ceilings: length × width, so 12 × 14 = 168 square feet. Total: 584 square feet. Now subtract the big openings — a standard door is about 21 square feet, a window about 15 — but skip anything under ~10 square feet — the offcuts cost more than the opening saves. Those two numbers are fixed standard-size allowances: the calculator subtracts the same 21 and 15 for every door and window you enter, whatever size they really are — so a double door or an oversized window will leave the count a little off.
Sheet coverage
Sheets = net area ÷ sheet area. A 4 × 8 sheet covers 32 square feet; a 4 × 12 covers 48. Bigger sheets mean fewer seams to tape and mud — and taping is where the labor hours live — but 12-footers need two people and won't turn tight stairs. The calculator works from the net area — the total minus doors and windows — and never rounds mid-stream: it divides, adds waste, and rounds up once at the end. In the worked example below, 548 net sq ft ÷ 32 = 17.125 sheets before waste.
Mud, tape, and screws
Every seam between sheets needs tape plus three coats of joint compound. Budget roughly one 5-gallon bucket of mud per 400 square feet of drywall, one roll of tape per 500 square feet, and about 32 screws per 4 × 8 sheet (one every 12 inches into each stud). Heavy texture or Level 5 smooth finishes drink more mud.
The waste factor
The calculator starts at 0 percent — no waste added. Add whatever cushion you want with the waste chips on the results screen (0/5/10/15/20%); 10 percent is the common pick. Miscuts, broken corners, and narrow rips that snap during handling add up fast, and drywall is cheap enough that the extra sheets are the least expensive line item on the job. In the worked example: 17.125 sheets × 1.10 = 18.84 → 19 sheets.
Worked example
12 × 14 room, 8' ceilings, one door, one window: walls 416 + ceiling 168 = 584 sq ft − 36 for openings = 548 sq ft net. 548 ÷ 32 = 17.125 sheets × 1.10 (with 10% waste added) = 18.84 → 19 sheets. Screws: 19 × 32 = 608. Mud: 548 ÷ 400 = 1.37 → buy 2 buckets. Tape: 548 ÷ 500 → 2 rolls.
Most Asked Questions
How many drywall sheets for a 12×12 room?
17 sheets of 4×8 — for 8-ft ceilings, walls and ceiling, with one door and one window. The math: walls 384 sq ft + ceiling 144 = 528, minus 36 for the openings = 492. Divide by 32 sq ft per sheet, add 10% waste with the chips, and round up: 17. Change the ceiling height or the openings and the count moves fast.
How much joint compound do I need?
About one bucket of mud for every 400 sq ft of drywall. For 4×8 sheets that's roughly a bucket per 12–15 sheets. Heavy texture or a Level 5 smooth finish drinks more — budget an extra bucket if you're going glass-smooth.
How many screws does drywall take?
About 32 screws in every 4×8 sheet. Bigger sheets take proportionally more — 40 in a 4×10, 48 in a 4×12 — figured at one screw every 12 inches into each stud. A 1-lb box holds about 300 screws, and the calculator totals the boxes for you.
How much waste does the calculator add?
Nothing is added until you add it — the waste starts at 0%. Tap a waste chip (10% is the common pick) and the sheet count updates right away.
Should I subtract doors and windows?
Yes — the calculator subtracts about 21 sq ft per door and 15 per window. Don't bother with anything under about 10 sq ft, though: the offcuts around a small opening cost more than the opening saves.
Should I use 4×8 or 4×12 sheets?
4×12 sheets mean fewer seams — and taping is where the labor hours live. A 4×12 covers 48 sq ft against the 4×8's 32. But 12-footers need two people to hang and won't turn a tight staircase; for a solo job or a chopped-up room, 4×8s handle easier.