Concrete Calculator
What are you pouring?
Pick one — the questions adapt to your project.
Pick a project type to continue.
How big is it?
Measure twice, pour once.
Anything else?
Optional — toggle on what applies.
Gravel base
Estimate crushed rock under the concrete
Rebar estimate
How much #4 steel you'll need
Bag size (for hand-mixing)
Call your plant for today's price — we'll estimate your total.
Mixing by hand instead? We'll price the bags too.
Waste allowance — extra for spills, uneven grade & over-dig
Your estimate
Order this much concrete
– cubic yards
💡 Pro field tips
🧰 Tools you'll need
Tap to check off as you load up.
Labor cost (optional)
Ready to order? Get local concrete delivery quotes.
See ready-mix plants and delivery trucks near your zip code on a map, and compare pricing before you order.
Free to compare • No obligation
Gear you'll need
Hand-picked tools for this exact job.
Marshalltown Finishing Trowel
The gold standard for smooth, pro finishes. Broken in properly, it lasts for years.
View Gear on Amazon →Concrete Screed Board & Placer
Strike it flat the first time — a straight screed and a good placer save hours of floating.
View Gear on Amazon →As an Amazon Associate, Kipi Calculator earns from qualifying purchases — at no extra cost to you.
File this estimate under a job name or PO to track what to order. Leave blank to file under "General".
Are you a professional contractor?
Upgrade to our downloadable, completely customizable Excel & Google Sheets Estimation Bundle to log clients, save quotes offline, and print branded estimates.
Copied to clipboard ✓
Estimates for planning only — confirm final quantities with your supplier and follow local building code.
How the math works
Concrete is sold by the cubic yard, but you measure your project in feet and inches. The whole job is converting what you measured into what the plant sells — then adding a little extra so you don't come up short. Running short mid-pour means a second truck, a short-load fee, and a cold joint — a weak, visible seam where the first batch started setting.
Step 1: Volume in cubic feet
Multiply length × width × thickness, with everything in feet. If your slab is 4 inches thick, divide by 12 first: 4 ÷ 12 = 0.33 feet. A 10-foot by 12-foot patio at 4 inches thick is 10 × 12 × 0.33 = 40 cubic feet. This works because volume is just area times depth — you're taking the slab's footprint and stacking it upward by its thickness. For round piers: 3.14 × radius × radius × depth.
Step 2: Convert to cubic yards
Cubic yards = cubic feet ÷ 27. A cubic yard is a cube 3 feet on each side, and 3 × 3 × 3 = 27, so every yard holds 27 cubic feet. Our 40 cubic feet ÷ 27 = 1.48 cubic yards. Ready-mix plants batch, truck, and price by the yard — this one division is the heart of the whole estimate, and it's the number the dispatcher will ask for when you call.
Step 3: The waste factor — your choice
The calculator starts at 0% waste — nothing is added until you tap a waste chip. Most people tap +10%: forms bow, subgrade is never level, and some always spills. On our example with +10% tapped: 1.48 × 1.10 = 1.63 yards, and the order rounds up to the nearest half yard — order 2 yards. Concrete itself is cheap compared to a second delivery, so the cushion is the cheapest insurance on the job.
Step 4: Bag math, if you're mixing by hand
An 80-pound bag of premix yields about 0.6 cubic feet of finished concrete (a 60-pound bag yields about 0.45, a 40-pound bag about 0.3). Divide your cubic feet by the bag yield: 40 ÷ 0.6 = 67 bags. With the +10% waste chip tapped, buy 74. Over about a yard, ready-mix is usually cheaper than bags — and easier on your back.
Worked example
10' × 12' patio, 4" thick: 10 × 12 × 0.33 = 40 cubic feet → 40 ÷ 27 = 1.48 yards → with the +10% waste chip tapped, × 1.10 = 1.63 yards → order 2 yards (orders round up to the nearest half yard). By bags: 40 ÷ 0.6 = 67 bags → 74 with the same +10%.
Worked example: a 24 × 24 ft garage slab
Say you're pouring a 24 × 24 ft garage slab, 4 inches thick, with a ready-mix truck. Here's the same math the calculator runs, done by hand:
- Volume: 24 × 24 × (4 ÷ 12) = 192 cubic feet
- Cubic yards: 192 ÷ 27 = 7.11 yd³ exact
- With the +10% waste chip tapped: 7.11 × 1.10 = 7.82 yd³ — rounded up to the nearest half yard, you order 8 yards
- Mixing by hand instead? 192 ÷ 0.6 ft³ per 80-lb bag = 320 bags (352 with the +10% cushion). Past about a yard, the truck is cheaper than your back.
That 8-yard order is the number you give the dispatcher — plus the pour time, the slump you want, and whether the truck can reach the forms or you're wheeling it.
On a real job
- Order for the cool part of the day in summer. Hot concrete sets fast, and a load that arrives at 2 p.m. in July gives you half the working time of a 7 a.m. pour.
- Guard the slump. Concrete that arrives too wet is tempting to "fix" with more water at the truck — don't. Water added on site beyond the mix design weakens the slab and shows up later as dusting and cracks.
- The slab is only as flat as what's under it. Screed the gravel base to grade before the truck comes. A high spot in the base steals slab thickness, and a 4-inch slab that's really 2½ inches over a hump is where cracks start.
- Have a home for the leftover. Pick a washout spot or a small extra pad before the truck arrives — not while it's idling with the drum turning.
- Cut the joints the same day. Control joints go about a quarter of the slab's depth, spaced in feet at roughly 2–3 times the slab thickness in inches — every 8 to 12 feet on a 4-inch slab. Concrete shrinks as it cures; the joint just decides where the crack hides.
Popular lookups
All charts · Bags for 1 yard · Bags for 2 yards · 10×20 slab · 20×20 slab · 24×24 slab
Most Asked Questions
How thick should my slab be?
4 inches for patios, walkways and most driveways. Go thicker — 5 to 6 inches — where heavy trucks park or the ground is soft. Thickness is the cheapest strength you can buy: the concrete itself costs far less than tearing out a cracked slab.
How much extra concrete should I order?
Your call — the calculator starts at 0% and adds nothing until you tap a waste chip. Most people tap +10%: forms bow, the ground under them is never perfectly level, and some always spills. Running short mid-pour means a second truck, a short-load fee, and a cold joint — a weak, visible seam where the first batch had already started to set.
How many bags do I need — or should I just call a truck?
An 80-lb bag makes about 0.6 cubic feet. Past roughly one cubic yard, ready-mix is usually cheaper than bags — and much easier on your back. A 10×12 patio at 4 inches takes about 74 bags with the cushion; that's a truck job for most people.
What happens if I add water at the truck to make it flow easier?
Don't — extra water weakens the slab. It's tempting when the mix looks stiff, but water beyond the mix design shows up later as dusting, surface wear and cracks. Order the slump you need instead of watering it up on site.
How far apart do control joints go?
Every 8 to 12 feet on a 4-inch slab, cut about a quarter of the slab's depth — the same day you pour. The rule behind it: spacing in feet runs about 2–3 times the slab thickness in inches. Concrete shrinks as it cures and it will crack somewhere; the joint just decides where the crack hides.
When is the best time of day to pour?
The cool part of the day in summer. Hot concrete sets fast — a load that lands at 2 p.m. in July gives you about half the working time of a 7 a.m. pour, and finishing work can't be rushed.