Concrete for a 24×40 Slab
A 24×40 foot slab covers 960 square feet. At the standard 4″ thick it takes 11.85 cubic yards — or 534 bags of 80 lb mix if you are bagging it. Order about 13.5 yards from a truck to cover waste and grade that is never perfect.
Concrete for a 24×40 slab by thickness
| Thickness | Volume | 80 lb bags | 60 lb bags | 40 lb bags |
|---|---|---|---|---|
| 4″ | 11.85 yd³ | 534 | 712 | 1067 |
| 5″ | 14.81 yd³ | 667 | 889 | 1334 |
| 6″ | 17.78 yd³ | 800 | 1067 | 1600 |
How it is figured
Volume = length × width × thickness, all in feet: 24 × 40 × (4 ÷ 12) = 320 ft³, and 320 ÷ 27 = 11.85 yd³. Bag counts divide the cubic feet by each bag's yield (0.6 / 0.45 / 0.3 ft³). The order figure rounds the yards up to the nearest half yard after a 10% allowance — ready-mix is sold in part-yard steps and a short load fee costs more than the extra concrete.
Driveways and anything a vehicle parks on usually want 5″ or 6″ and rebar or mesh — the table has those volumes. Patios and shed floors are fine at 4″. The free concrete calculator handles footings, columns, and odd shapes too.
Keep figuring
Concrete calculator · All charts & tables · Bags per yard chart
Common questions
How much concrete do I need for a 24×40 slab?
At 4 in. thick: 11.85 cubic yards (534 bags of 80 lb, 712 of 60 lb, 1067 of 40 lb). Order about 13.5 yards to cover waste. At 6 in. thick it is 17.78 yards.
How many bags for a 24×40 slab?
For a 4 in. slab: 534 bags of 80 lb mix, 712 of 60 lb, or 1067 of 40 lb. That is a lot of mixing — past a yard, a ready-mix truck usually wins.
How thick should the slab be?
4 in. for patios, walkways, and shed floors. 5–6 in. for driveways and anything vehicles park on, with rebar or wire mesh. Local frost rules can require footings at the edges — check local code.