Gravel Calculator

    What are you spreading?

    Pick your material — the math adjusts.

    How big is the area?

    Length × width, plus how deep the layer goes.

    Typical base is 4–6 inches deep. Measure in a few spots — it varies.

    Waste allowance — extra for spills, uneven grade & over-dig

    Your material order

    Order this much

    – yd³

    Exact volume
    –
    No waste added
    –
    Est. weight
    –
    Area
    –

      💡 Pro field tips

        🧰 Tools you'll need

        Tap to check off as you load up.

        Est. project cost (optional)

        File this estimate under a job name or PO to track what to order. Leave blank to file under "General".

        How the math works

        Gravel lives a double life: it's sold by volume (cubic yards) but hauled by weight (tons). The math connects the two, then adds a third wrinkle — compaction — because a pile of loose gravel and a finished driveway are not the same thickness. Here's how all three pieces fit together.

        Volume: length × width × depth

        Measure everything in feet, multiply, and divide by 27 — because one cubic yard is a 3 × 3 × 3-foot cube, which is 27 cubic feet:

        Cubic yards = Length (ft) × Width (ft) × Depth (ft) ÷ 27

        Depth almost always starts in inches, so divide by 12 first: 4 inches = 4 ÷ 12 = 0.33 feet. A 12 × 30 driveway at 4 inches deep: 12 × 30 × 0.33 = 120 cubic feet ÷ 27 = 4.44 cubic yards.

        Weight: the 1.4-tons rule

        A cubic yard of gravel weighs about 1.4 tons (2,800 lbs) — crushed stone runs a little heavier, pea gravel a little lighter. Weight matters because trucks have legal limits: a single-axle dump truck hauls roughly 7–8 tons, a tandem about 14–16. The conversion:

        Tons = Cubic yards × 1.4

        Our 4.44 yards × 1.4 = 6.2 tons — one single-axle load, comfortably. Knowing the weight also keeps you from ordering 20 tons for a garden path and paying for a second delivery you never needed.

        Compaction: the hidden extra

        Loose gravel compacts 20–30% under a plate compactor or vehicle traffic. That 4-inch layer you spread becomes roughly 3 inches once it's settled. Two ways to handle it: order for the loose depth and accept whatever finished depth results, or add ~25% and compact in 4-inch lifts to hit your target finished depth. For driveways that need to stay put, compacting in lifts is the pro move — dumping 8 inches at once and rolling only the top leaves a soft sponge underneath that ruts out by spring.

        Worked example: 12 × 30 driveway, 4" finished depth

        • Volume: 12 × 30 × (4 ÷ 12) = 120 ft³ ÷ 27 = 4.44 cubic yards
        • Weight: 4.44 × 1.4 = 6.2 tons
        • Compaction allowance: order for ~5" loose → ~5.5 yards / 7.7 tons
        • Waste factor: add 10% for an uneven subgrade and spillage at the edges — low spots eat gravel. That chain lands at about 8½ tons (7.7 × 1.10 ≈ 8.56).

        One delivery of about 8½ tons, one afternoon with a rented compactor, and you've got a driveway that stays where you put it.

        Worked example

        You're topping up a 10 × 40 ft driveway with 3 inches of crushed stone. Using this calculator's own math:

        • Volume: 10 × 40 × (3 ÷ 12) = 100 cubic feet
        • Cubic yards: 100 ÷ 27 = 3.70 yd³ exact
        • Order quantity with 10% waste added: 4.08 yd³
        • Weight: 3.70 × 1.4 = about 5.2 tons — yards sell stone by the ton, so you'd ask for about 5.7 tons loaded to cover the waste yardage

        One small dump load covers it — no second trip, no pile left over in the yard.

        On a real job

        • Compact in lifts, not all at once. Spread no more than about 4 inches loose at a time and run a plate compactor over each lift. Dump 8 inches and roll only the top and you've built a sponge — it will rut by spring.
        • Crown the driveway. Shape the middle about ¼ inch per foot higher than the edges (roughly 2%) so water sheds off instead of ponding and softening the base.
        • Stone migrates — give it a border. Steel, paver, or timber edging keeps driveway stone in the driveway instead of slowly spreading into the lawn.
        • Don't lay stone over soft, wet dirt. It pumps mud up through the rock under tire loads. Strip the mud, put down road base or a geotextile fabric first, then your finish stone.
        • Fabric under new stone on bare ground keeps the stone from mixing into the soil — and keeps your 3 inches at 3 inches instead of disappearing into the dirt a little more every year.

        Most Asked Questions

        How deep should a gravel base be?

        4 to 6 inches for a typical base. That's the depth this calculator is built around. Deeper isn't automatically better — what matters is that the depth is even, because low spots eat gravel and high spots steal strength from whatever sits on top.

        Is gravel sold by the yard or by the ton?

        Both — it's ordered by volume and hauled by weight. One cubic yard weighs about 1.4 tons (2,800 lb). A 12×30 driveway at 4 inches is 4.44 cubic yards, which is about 6.2 tons — one comfortable single-axle load.

        Why does my 4-inch layer end up thinner than 4 inches?

        Loose gravel compacts 20–30%. Spread 4 inches loose and you'll finish near 3 inches once it's rolled or driven on. To hit a true finished depth, order for about 5 inches loose and compact in 4-inch lifts.

        Can I just dump it all at once and roll the top?

        No — compact in lifts of about 4 inches. Rolling only the top of a deep dump leaves a soft sponge underneath, and that's the driveway that ruts out by spring.

        How much extra should I order?

        About 10% over the exact volume, on top of the compaction allowance. Uneven ground and spillage at the edges eat material on every job. For the 12×30 driveway above, that math lands at about 8½ tons (7.7 × 1.10 ≈ 8.56) — one delivery, one afternoon.

        How much can one truck bring?

        A single-axle dump truck hauls roughly 7–8 tons; a tandem about 14–16. Knowing your tonnage before you call keeps you from paying for a second delivery you never needed — or stranding a crew with half a load missing.

        Next calculation

        One job usually leads to the next number. Common next steps from here:

        Working on a whole slab? Project Mode chains concrete, gravel base, rebar and forms into one order list.

        Embed this calculator on your site

        Run a DIY, contractor, or supplier site? Put this gravel calculator right on your page, free. Copy the code and paste it where you want it — your visitors get the numbers without leaving your site.

        Free to use. The small “Powered by Kipi Calculator” line at the bottom of the calculator stays on — that’s all we ask.