Paver Calculator
Which paver are you laying?
Pick the paver size — the math adjusts.
Pick a paver type to continue.
How big is the patio?
Length × width of the area you're paving.
What pattern?
Fancier patterns mean more cuts — you add the waste you want on the results screen.
Pick a pattern to continue.
Your paver count
Waste allowance Starts at 0% — tap to add a cushion for cuts & breakage.
Buy this many pavers
–
- Exact pavers
- –
- With waste
- –
- Bedding sand
- –
- Edging
- –
💡 Pro field tips
🧰 Tools you'll need
Tap to check off as you load up.
Est. project cost (optional)
File this estimate under a job name or PO to track what to order. Leave blank to file under "General".
Copied to clipboard ✓
How the math works
A paver patio is a sandwich: compacted base, 1 inch of bedding sand, pavers, joint sand locking it together. The math sizes every layer — because a patio that looks great on day one and sinks by year two was a base-depth problem, not a paver problem.
Patio area
Area = Length × Width
12 × 16 = 192 sq ft. For curves: measure the bounding rectangle × 0.8 for a kidney shape. Everything — pavers, sand, base — scales from this number.
Paver count
Pavers = Area ÷ (Paver length × Paver width, in feet)
4×8-in pavers = 0.222 sq ft each: 192 ÷ 0.222 = 864. The catch: ⅛-in joints add ~3–5% coverage, so the calculator's paver size includes a joint allowance — without it, 864 nominal pieces would leave you short.
The base: two layers, two jobs
Compacted base (crushed stone), 4–6 in deep, compacted in 2-in lifts: carries the weight. Bedding sand (coarse concrete sand), exactly 1 in, screeded flat and NEVER pre-compacted: pavers bed into it evenly.
Volume (cu yds) = Area × Depth (ft) ÷ 27
Base at 4 in (0.333 ft): 192 × 0.333 ÷ 27 = 2.37 → order 2.5 cu yds. Bedding at 1 in: 0.59 → order 0.75. Two inches of base under a patio is a sunken patio within two winters — frost heave doesn't negotiate.
Edge restraints and joint sand
Edge restraint = Patio perimeter (56 ft here) — without it, pavers creep outward a half inch a year. Polymeric sand ≈ Area ÷ 100 bags (192 → ~2 bags): swept in, watered, hardens like flexible grout and blocks weeds.
Waste factor
Pavers: 10% for cuts (15% for herringbone — nearly every border piece is a cut). Base/sand: 10%, because excavation is never perfectly level and low spots eat material.
Buy = Pavers × 1.10, rounded UP → 864.86 × 1.10 = 951.35, rounded up to 952
Worked example: 12 × 16 patio, 4×8 pavers
- 952 pavers (865 exact, with the 10% chip); 0.59 cu yds bedding sand
- 56 ft edge restraint + spikes. From the guide below (not calculator outputs): base gravel ≈ 2.5 cu yds ordered; polymeric sand ≈ 2 bags
Most Asked Questions
How many pavers do I need for a 12×16 patio?
865 pavers exact with 4×8 brick pavers — 952 with the 10% waste chip. The patio is 192 sq ft and each 4×8 covers 0.222 sq ft: 192 ÷ 0.222 = 864.86, rounded up. Cuts and breakage are what the chip covers.
How much bedding sand do I need?
0.59 cubic yards for a 12×16 patio. The calculator figures a 1-inch bedding layer — area × 1 in ÷ 27. The compacted gravel base underneath is a separate layer and isn't in this number.
How much edging do I need?
56 feet for a 12×16 patio — the full perimeter. Edging is 2 × (length + width), and it's what keeps the paver field from creeping outward over time.
Does the pattern change how many pavers I need?
No — running bond, herringbone and stack bond all count the same here. The pattern is a label in this calculator; the extra cuts come from the waste chips. Herringbone cuts nearly every border piece, so the 15% chip is the smarter pick for it.
How many 12×12 pavers do I need for a 10×10 patio?
100 pavers exact. Each 12×12 covers a full square foot, so the count matches the area — then tap a waste chip for the cuts at the edges.
Why does a 4×8 paver count as 0.222 sq ft?
Because the joints take room too. That figure builds in a ⅛″ joint allowance — counting the bare paver size alone would leave you a few pieces short on a big patio.