Project Mode: One Slab, One Order List
A slab is never just concrete. It is concrete, a gravel base, a rebar grid, and the boards to form it — four trips through four calculators. Project Mode chains them: measure once, and get a single order list you can copy, print, share with a link, or save to your Job Log.
How each line is figured
- Concrete: length × width × thickness, divided by 27 for cubic yards, with the standard 10% extra — the same math as the concrete estimator. Bag count uses 80 lb bags at 0.6 ft³ each.
- Gravel base: area × base depth, at 1.4 tons per cubic yard — same as the gravel calculator.
- Rebar: a grid at your spacing, figured in linear feet, then cut into 20 ft sticks with 5% extra for cuts and laps.
- Forms: the slab perimeter in 8 ft 2×6 boards, rounded up.
Common questions
Can I send this list to my supplier?
Yes — tap "Copy order list" and paste it into a text or email, or use "Share this project" to copy a link that reopens this page with the same measurements filled in.
Does Project Mode replace the individual calculators?
No — it chains the four slab materials for a fast order list. For footings, columns, cost fields, and job pricing, use the full concrete estimator and Bid Builder.