Grade & Slope Calculator
How are you working it out?
Three ways in — pick the one that matches what you've got.
Pick a way in to continue.
Your numbers
Fractions work in the distance boxes — type 5' 4 1/2" and we'll convert it.
Which way does it slope?
The horizontal distance — not the slope distance.
Elevations just as they come off the rod or the plan — 100.00 at the high end, 97.50 at the low end. We'll work out which way it falls.
Which way should it slope?
Say it out loud: "How much fall over my 40 ft driveway at 2%?"
Your grade
The grade is
–%
- Angle
- –
- Slope ratio
- –
- Total fall
- –
- Total fall
- –
- Run
- –
- Fall per foot
- –
Percent grade is feet of rise or fall per 100 ft of run — a 2% grade drops 2 ft over 100 ft, or 0.24 inches in every foot (that's the "inches per foot" number plumbers and concrete crews talk in).
🚧 Grading a pipe run instead?
Pipe has minimum slopes by size, inverts and bury depths. The pipe tools check all of that for you.
📏 Reference points people check against
Common yardsticks, not code — every city and job spec is different. Always confirm your local code before you build to a number.
- ~1% — about the least fall that keeps water moving on pavement instead of ponding.
- 2% — the classic sewer lateral slope: 1/4 inch of fall per foot.
- 1/4 in per foot = 2.08% — the same slope said the plumber's way.
- 8.33% (1:12) — US ADA maximum ramp slope.
- ~15% — a residential driveway starts feeling steep around here; much past it, vehicles and winter weather struggle.
💡 Pro field tips
🧰 Tools you'll need
Tap to check off as you load up.
File this grade under a job name or PO. Leave blank to file under "General".
Copied to clipboard ✓
How the math works
Grade is just a comparison of two numbers: how much the ground goes up or down (the rise) against how far it travels to do it (the run). Every way of saying a slope — percent, angle, ratio, inches per foot — is that same comparison in a different outfit.
Percent grade
Grade % = (Rise ÷ Run) × 100
Percent grade means feet of rise or fall per 100 feet of run. A 2% grade falls 2 feet in 100 feet. It's the number road crews, excavators and plan sets talk in, and the one this calculator leads with.
From two elevations
Fall = Start elevation − End elevation
Shoot both ends with a laser or read them off the plan. If the end elevation is lower, the run falls that many feet; if it's higher, the run rises. Divide the fall by the distance and multiply by 100 and you've got the grade — 100.00 down to 97.50 over 125 feet is a 2.50 ft fall, and 2.50 ÷ 125 × 100 = 2.00%.
From a target grade
Rise needed = (Grade % ÷ 100) × Run
Laying out instead of measuring? Flip the formula around: at 2% over a 40 ft driveway you need 0.02 × 40 = 0.80 ft of fall — 9.6 inches from the high end to the low end. Set your end stakes that far apart in elevation and the grade takes care of itself.
Angle and ratio
Angle = arctan(Rise ÷ Run), in degrees. Slope ratio writes the same thing as 1 : X — one unit of rise for every X units of run. A 1:12 ramp rises 1 foot in 12, which is 8.33% and about 4.76°. Ratios are how ramps and embankments get specified; percent is how roads and drainage get specified; this calculator gives you both.
Inches per foot
Inches per foot = Grade % × 0.12
One percent over one foot is 0.12 inches, so multiply and you can talk to the plumbers: 2% is 0.24 in/ft — a hair under the classic 1/4 inch per foot, which is exactly 2.08%.
Reference points, honestly labeled
The reference panel on the results screen lists the yardsticks people check against — about 1% as the least fall that moves water on pavement, 2% for sewer laterals, 8.33% as the US ADA maximum ramp slope, and roughly 15% where a residential driveway starts feeling steep. They are reference points, not code: plenty of jobs are built a little over or under them by local rule or engineer spec. Confirm your local code before you build to any of them.
Pipe runs are a different job
This is the general grade tool — driveways, ramps, patios, yard drainage, site grading. If the slope is for a pipe, use the Storm Drain Grade Calculator or the Sewer Line Grade Calculator instead: they work from inverts, check the minimum slope for your pipe size, and build the station-by-station grade table a crew actually digs to.
Worked example
You're checking a driveway that runs 125 ft from the garage to the street. The laser says the garage floor sits at elevation 100.00 and the street end at 97.50. Using this calculator's own math:
- Fall: 100.00 − 97.50 = 2.50 ft
- Grade: 2.50 ÷ 125 × 100 = 2.00%
- Angle: arctan(2.50 ÷ 125) = 1.15°
- Ratio: 125 ÷ 2.50 = 1 : 50
- Inches per foot: 2.00 × 0.12 = 0.24 in/ft
Two percent is a comfortable driveway — water sheds, cars don't notice it, and it sits right at the classic drainage slope. The calculator says it the way the crew needs it: falls 2.50 ft over 125 ft, 2.00% downhill.
On a real job
- Shoot both ends from one setup when you can. Moving the laser between shots invites a bumped tripod into your numbers. One setup, two rod readings, clean subtraction.
- The rod reads in tenths. Grade rods are marked in feet and tenths, not inches — a reading of 4.25 ft is 4 ft 3 in, not 4 ft 2.5 in. Our grade rod guide walks through it.
- Grade the dirt, not just the surface. If the slab or asphalt goes in at a fixed thickness, the subgrade needs the same slope as the finished surface — grade the base to the number, then the top follows.
- Check long runs in sections. A run can average 2% and still hide a flat belly in the middle that holds water. Shoot every 25 ft or so on long drainage runs — the pipe slope guide shows the station habit, and it works for swales and driveways too.
- Short run? String line and a line level. For a patio or a short walk, a tight string with a line level gets you close enough to set forms — then confirm the fall with the target-grade mode above.
- Write both elevations down. "It falls about two and a half feet" gets argued about; 100.00 → 97.50 doesn't.
Most Asked Questions
What is the grade from elevation 100.00 down to 97.50 over 125 ft?
2.00%. The fall is 100.00 − 97.50 = 2.50 ft, and 2.50 ÷ 125 × 100 = 2.00%. The calculator also says it the other ways crews talk: a 1.15° angle, a 1 : 50 ratio, and 0.24 inches per foot.
What does a 2% grade actually mean?
2 feet of rise or fall for every 100 feet of run. Percent grade is the number road crews, excavators, and plan sets talk in. The reference panel on the results screen lists about 1% as the least fall that moves water on pavement — reference points, not code, so confirm your local rule before you build to one.
How much fall do I need for a 2% grade over a 40 ft driveway?
0.80 ft — 9.6 inches from the high end to the low end. Flip the formula around: rise needed = grade ÷ 100 × run, so 0.02 × 40 = 0.80 ft. Set your end stakes that far apart in elevation and the grade takes care of itself.
How do I turn percent grade into inches per foot?
Multiply the percent by 0.12. One percent over one foot is 0.12 inches, so 2% is 0.24 in/ft — a hair under the classic 1/4 inch per foot, which is exactly 2.08%. That is the conversion that lets you talk to the plumbers.
What is a 1 : 12 slope in percent?
8.33%, at about a 4.76° angle. A 1 : 12 ramp rises 1 foot for every 12 feet of run, and 1 ÷ 12 × 100 = 8.33%. The reference panel lists 8.33% as the US ADA maximum ramp slope — a reference point, not a code quote, so confirm your local code before building to it.
Should I use this calculator for a pipe run?
No — pipe runs have their own tools here. This is the general grade tool for driveways, ramps, patios, yard drainage, and site grading. The Storm Drain and Sewer Line calculators work from inverts, check the minimum slope for your pipe size, and build the station-by-station grade table a crew actually digs to.