Metal Roofing Calculator
How big is the roof?
Measure the building footprint from the ground, eave to eave — we do the slope math. This figures a simple gable roof: two slopes, no hips or valleys.
Along the ridge and eave
Across the gable, eave to eave
Pitch = inches of rise per 12" of run
Pick a pitch.
Panel coverage
How much roof each panel covers side to side — the exposed width after the side lap, not the full sheet width.
Pick a panel coverage to continue.
Waste allowance — extra panels for cuts, damage & a spare
Your metal roof order
Order this many
– panels
Scope: a simple gable roof (two slopes). Panels are figured at the exposed coverage you picked, and panel length is the slope length, eave to ridge — order panels a few inches longer if you want overhang past the eave. The screw count is a planning rule of thumb (about 1 screw per square foot of roof) — confirm fastener counts and patterns with your panel maker.
- Panel length
- –
- Panels per slope
- –
- Ridge cap
- –
- Screws (approx.)
- –
- Roof area
- –
- Squares
- –
💡 Pro field tips
🧰 Tools you'll need
Tap to check off as you load up.
Est. project cost (optional)
File this estimate under a job name or PO to track what to order. Leave blank to file under "General".
Copied to clipboard ✓
How the math works
Metal roofing isn't sold by the square foot — it's sold by the panel, cut to the length of your slope, plus ridge cap by the piece and screws by the box. So the estimate runs in that order: slope length first, then panels across, then the trim and fasteners. This calculator figures a simple gable roof — two slopes, no hips or valleys.
Slope length: half the width × the pitch factor
Each slope covers half the building width, stretched by the pitch. The factor is the same one roofers use for shingles — it comes straight from the Pythagorean theorem: a 6/12 pitch (rises 6 inches per 12 inches of run) has a slope of √(6² + 12²) = 13.4 inches per 12 inches of run, a factor of 1.118. Common factors: 4/12 → 1.054, 6/12 → 1.118, 8/12 → 1.202, 10/12 → 1.302, 12/12 → 1.414.
Slope length = (Width ÷ 2) × Pitch factor
That slope length is also your panel cut length, eave to ridge. Most crews order panels a few inches longer for eave overhang and trim the ridge end if needed.
Roof area: footprint × pitch factor
Roof area = Length × Width × Pitch factor
A flat footprint understates a sloped roof — skip the factor and you'll under-order everything that keys off area, like screws.
Panels: eave length ÷ coverage, rounded up, × 2
Panels run vertically, eave to ridge, side by side along the eave. What matters is the exposed coverage — how much roof a panel actually covers after the side lap. The standard exposed-fastener panel covers 36 inches; narrower and corrugated profiles cover 26 inches. Always confirm the exposed coverage with your panel maker — ordering off the full sheet width is the classic short-load mistake.
Panels per slope = Roof length ÷ Coverage, rounded up — then double it for the two slopes.
Waste: your call, starting at 0%
Panels get damaged, miscut, and a spare that matches the dye lot is worth having. The waste chips start at 0% — nothing is added until you tap. The calculator adds the percentage you choose to the panel count and rounds up:
Panels to order = Panels × (1 + your waste %), rounded up
Ridge cap: the roof length, in 10-ft pieces
The ridge runs the full length of the roof, and ridge cap comes in 10-foot pieces:
Ridge pieces = Roof length ÷ 10, rounded up
Screws: about 1 per square foot — a planning figure
Fasteners are the roughest number on a metal roof because the pattern depends on the panel profile and the maker's spec. The planning rule used here is about 1 screw per square foot of roof area, sold in boxes of 250:
Screw boxes = (Roof area × 1) ÷ 250, rounded up
Treat that as an order-planning estimate, not an engineering count — confirm with your panel maker before the truck rolls.
Worked example: 40 × 30 building, 6/12 pitch, 36″ coverage
- Slope length: (30 ÷ 2) × 1.118 = 16.77 ft — that's the panel cut length
- Roof area: 40 × 30 × 1.118 = 1,341.6 sq ft (13.42 squares)
- Panels per slope: 40 ÷ 3 ft = 13.33 → 14 panels; both slopes = 28 panels
- At 0% waste (the chips start at 0%): 28 panels to order. If you tap +10%: 28 × 1.10 = 30.8 → 31 panels to order
- Ridge cap: 40 ft → 4 pieces × 10 ft
- Screws: ≈ 1,342 → 6 boxes of 250
Twenty-eight panels at 16.77 ft at 0% — thirty-one if you tap +10% — four sticks of ridge, six boxes of screws: a full material list from two measurements and a pitch.
Worked example
You're putting metal on a 40 × 30 ft shop, 6/12 pitch, with standard 36-inch panels. Using this calculator's own math:
- Slope length: 15 ft half-span × 1.118 = 16.77 ft panels
- Panels: 14 per slope × 2 = 28 at 0% — if you tap +10% waste, 31 panels
- Ridge: 40 lin ft → 4 pieces
- Screws: ≈1,342 → 6 boxes
One call to the metal shop with real numbers — no guessing at the counter, and no second trip because a panel came up short.
On a real job
- Measure eave to eave, not wall to wall. Panels cover roof, not floor plan — include the overhang in your width, or your cut length comes up short on both slopes.
- Confirm exposed coverage before you order. A "36-inch panel" that laps to 34 inches of coverage leaves you a panel short on every slope. The number that matters is coverage, not sheet width.
- Trim is a separate order. Gable trim, eave trim, closures, and flashing aren't in this count — walk the roof edges and list them with the panel order so it all rides on one truck.
- Underlayment still matters. Metal sheds water, but condensation and wind-driven rain get under it. Budget synthetic underlayment for the same square footage as the roof area.
- Walk the flats, not the ribs. Stepping on ribs bends them and breaks the paint. Soft soles, flat of the panel, and a harness on anything steep.
- Don't overdrive the screws. The washer should be snug and slightly compressed — crushed washers split and leak within a few seasons.
Most Asked Questions
How many metal panels do I need for a 40 × 30 ft roof?
28 panels at 6/12 pitch with standard 36″ coverage. That's 14 panels per slope × 2 slopes, each cut to the 16.77 ft slope length. This calculator figures a simple gable roof — two slopes, no hips or valleys.
How long are the panels cut?
The slope length — 16.77 ft on that roof. Half the width (15 ft) × the 6/12 pitch factor 1.118. Order a few inches longer if you want overhang past the eave — you can trim a panel, you can't stretch one.
Does panel coverage change the count?
Yes — coverage is what counts, not sheet width. The same 40 × 30 roof takes 38 panels at 26″ coverage (19 per slope) instead of 28 at 36″. Confirm the exposed coverage with your panel maker before you order.
How much ridge cap and how many screws?
40 ft of ridge — 4 pieces of 10 ft — and about 1,342 screws (6 boxes of 250). The ridge runs the roof's length. Screws are figured at roughly 1 per square foot of roof area (1,341.6 ft²) as a planning figure — your maker's fastening pattern wins.
How many squares is that roof?
13.42 squares. Roof area is footprint × pitch factor: 1,200 × 1.118 = 1,341.6 ft², and one square is 100 ft². Skip the pitch factor and you'll under-order everything that keys off area.
Should I add waste to the panel count?
The count starts exact — 28 panels, nothing added. Tap +10% and it orders 31. A spare panel from the same dye lot is worth having if one gets damaged or miscut.