Kipi Calculator SEWER LINE GRADE CALCULATOR by Kipi Calculator 🌐 Español

Sewer Line Grade Calculator

    The run

    Where the line starts, and how far it runs — to the main, the manhole, or the next cleanout.

    The inside bottom of the pipe at the start — off the plans or your last shot.

    End to end of the run you are grading — building to main, or manhole to manhole.

    Smaller pipe needs more slope to stay self-cleaning — the results check your grade against the usual minimum for the size you pick.

    The fall

    How much drop does this run get? Either way works.

    Sewer grades are usually called in inches per foot: ¼ in/ft ≈ 2.08%, ⅛ in/ft ≈ 1.04%.

    Bury depths

    Optional — add the rim (surface) elevation at each end and we will figure the bury depth, rim down to invert. Skip it if you just need the grades.

    Rim = finished ground, manhole lid, or cleanout top at that end — from the plans or your shot. Bury depth runs down to the invert; the dirt cover over the pipe itself is less, by about the pipe's outside diameter.

    Your grades

    End invert elevation

    – ft

    Total fall
    –
    Slope
    –
    Slope per foot
    –
    Fall per 10 ft
    –
    Pipe size
    –

    📏 Grade table

    Distance from startInvert elevationDrop from start

      💡 Pro field tips

        🧰 Tools you'll need

        Tap to check off as you load up.

        File this run under a job name or PO to keep the grades with the job. Leave blank to file under "General".

        Assumptions & limits: Elevations are in feet with decimals — hundredths of a foot (100.00 means 100 ft; 0.01 ft is about 1/8 inch). Enter inverts from your project plans, tied to the site benchmark — this calculator does the math on the numbers you give it and does not replace the plans. The minimum slopes flagged here are the usual planning values by pipe size (4 in: 2.08%, 6 in: 1.04%, 8 in: 0.40%, 10 in: 0.28%, 12 in: 0.22%, 15 in: 0.15%) — local code and your plans govern, and they can require more. Bury depth is measured to the invert; cover over the pipe is less by roughly the pipe's outside diameter. Very steep runs may need pipe anchors, restraints, or drop structures. Always verify grades against the project plans and local code before you dig.

        How the math works

        A sewer line is one straight downhill run between two inverts — the building and the main, or manhole to manhole. The elevations work in feet and hundredths (0.01 ft is about 1/8 inch, and in the trench the drop gets called in tenths off the rod), but sewer grades themselves are usually specified one more way: inches per foot. This calculator speaks all three.

        Slope: percent and inches per foot

        Percent slope is the fall spread over the run. Inches per foot is the same slope in the units on most sewer plans and code tables:

        Slope % = (Start invert − End invert) ÷ Run length × 100

        Inches per foot = Slope % × 12 ÷ 100 — so 2.08% is ¼ in per foot, and 1.04% is ⅛ in per foot

        Total fall (ft) = Run length × Slope % ÷ 100

        The end invert

        Subtract the fall from where you started:

        End invert = Start invert − Total fall

        Stations: the grade at any point

        Once you have the slope, the invert at any distance down the run is the start minus that distance's share of the fall:

        Invert at distance d = Start invert − (d × Slope % ÷ 100)

        The grade table in the results does this every 10 ft (every 25 ft on long runs) so you can set the laser, shoot each station, and catch a belly or a high spot before the bedding goes in — a belly in a sewer is a clog that hasn't happened yet.

        Minimum slope: smaller pipe needs more fall

        A sewer has to move solids, not just water, so the smaller the pipe, the steeper the usual minimum. The planning values used here:

        • 4 in building sewer: 2.08% (¼ in per foot)
        • 6 in: 1.04% (⅛ in per foot)
        • 8 in: 0.40%
        • 10 in: 0.28%
        • 12 in: 0.22%
        • 15 in: 0.15%

        Local code and the project plans govern — they can and do require more.

        Bury depth: rim minus invert

        How deep the line lies at either end:

        Bury depth = Rim (surface) elevation − Invert elevation

        The cover over the pipe — the dirt between the surface and the top of the pipe — is the bury depth minus the pipe's outside diameter. Crews use bury depth to call trench depth and shoring; inspectors and frost depth care about cover.

        Worked example: 100 ft building sewer, start invert 100.00, 4 in pipe at ¼ in per foot

        • Slope: ¼ in per foot = 2.08%
        • Total fall: 100 × 2.08 ÷ 100 = 2.08 ft (24.96 in)
        • End invert: 100.00 − 2.08 = 97.92
        • Fall per 10 ft: 0.21 ft (2.5 in · 2.1 tenths)

        One line, falling a quarter inch with every foot, from the building to the main.

        Worked example

        An 80-ft building sewer in 6-inch pipe, leaving the building at invert 100.00, run at ⅛ inch per foot (1.04%) — the usual minimum for 6-inch:

        • Total fall: 80 × 1.04 ÷ 100 = 0.83 ft — right at 10 inches of drop, end to end
        • End invert at the main: 100.00 − 0.83 = 99.17
        • Drop every 10 ft: 0.10 ft (1¼ inches — about one tenth on the rod)
        • Slope check: 6-inch minimum is 1.04%. This run sits exactly on it — there is no room to flatten anywhere along the line.

        Ten inches of fall over eighty feet. That's the whole job: protect those ten inches.

        On a real job

        • Local code governs — check it before you dig. Some jurisdictions require ¼ inch per foot on a 6-inch building sewer instead of ⅛. The plans and the inspector outrank any calculator, including this one.
        • A belly is a clog that hasn't happened yet. Bed the pipe on shaped gravel, keep the fall continuous, and shoot every station. Solids settle anywhere the line sags, and they do not forgive.
        • Plan the cleanouts while the trench is open. Code typically wants one where the line leaves the building and at intervals on long runs. A cleanout costs little in an open trench and a fortune through finished concrete.
        • Call 811 before the bucket touches dirt. Locates are free; a hit gas line or fiber cut is not. Wait for the marks and dig careful inside the tolerance zone.
        • Test before you backfill where required. Many inspectors want a water or air test on the line first. Backfilling an untested line that fails means digging your work up twice.

        Most Asked Questions

        What is the minimum slope for a sewer line?

        Smaller pipe needs more fall: 1/4 in per foot (2.08%) for 4-inch, 1/8 in per foot (1.04%) for 6-inch. The bigger sizes run flatter — 8 in: 0.40%, 10 in: 0.28%, 12 in: 0.22%, 15 in: 0.15%. Those are the usual planning minimums this calculator flags; local code and your project plans govern and can require more.

        Can I use this calculator for a septic line?

        Yes — a septic line is graded exactly like a building sewer. Enter the start invert, run length, and pipe size and you get the end invert, total fall, and a station-by-station grade table, with the same minimum-slope checks. Your local health department's permit rules govern the final design.

        Why does a sewer line need slope at all?

        Sewer flows by gravity — the water has to move about 2 feet per second to carry the solids with it. Too flat and the flow slows, solids settle out, and the line starts to clog. Too steep isn't free either: the water can outrun the solids, and the pipe may need anchors or drop structures.

        What is an invert — and what is bury depth?

        The invert is the inside bottom of the pipe — every grade is measured to it, never to the top (crown). Bury depth is how far the pipe sits below the surface: rim (ground, manhole lid, or cleanout top) minus the invert. The cover over the pipe is the bury depth minus the pipe's outside diameter.

        What is the difference between a building sewer and a sewer main?

        The building sewer is the smaller line — usually 4 or 6 in — from the building out to the street. The main is the larger line (8 in and up) running down the street that laterals tie into, with manholes where it changes direction, size, or slope. More flow in a bigger pipe means the main can run at much flatter grades.

        How much fall is 1/4 inch per foot over 40 feet?

        10 inches — 40 ft × 1/4 in = 10 in, which is 0.83 ft. The conversion both ways: slope % × 12 ÷ 100 gives inches per foot, and inches per foot × 100 ÷ 12 gives percent. So 1/4 in per foot is 2.08%.

        Popular lookups

        All charts · 4″ over 50 ft · 4″ over 100 ft · 6″ over 100 ft

        Next calculation

        One job usually leads to the next number. Common next steps from here:

        Embed this calculator on your site

        Run a DIY, contractor, or supplier site? Put this sewer line grade calculator right on your page, free. Copy the code and paste it where you want it — your visitors get the numbers without leaving your site.

        Free to use. The small “Powered by Kipi Calculator” line at the bottom of the calculator stays on — that’s all we ask.